|
Posted by hallerb@aol.com on March 29, 2007, 10:46 pm
> I have some minor cracks in my basement foundation that need fixin'
> Afterward, I'm giving the concrete 28 days to dry.
>
> However, while the concrete dries, I'm also going to seal the joint
> between the basement wall and foundation. =A0Any recommendations on what
> product I should use. =A0I know Drylock and Quikrete have products.
>
> Then when I'm done with these two steps, do I do Drylock the walls
> first or apply an epoxy finish to the basement foundation first.
> Suggestions appreciated.
>
> TIA,
> Steven
If you have ANY water coming in add a interior french drain and sump
pump or gravity drain to daylight.
Drylock paint will BUBBLE if water is in wall.
Then do the walls first, then epoxy the floor, although honestly
concrete isnt meant to be painted with anything!
|